Project Overview
Will Rogers International Airport conducted a baggage claim replacement project.
Parkhill Architecture was selected to lead the design team and engaged Logplan to provide all BHS-related services.
The existing claim devices at OKC were evaluated as nearing end of life. Logplan progressed through a BHS design for the entire inbound system, including six (6) flat plate claim devices, twelve (12) security doors, and six (6) motor control panels. The design was completed and submitted for open bid in late 2024.
Logplan provided bidding services and assisted the airport in evaluating proposals and selecting the successful contractor. Logplan also provided construction administration services. The project was successfully tested, commissioned, and placed into service ahead of schedule.
BHS Inbound Replacement